90% RECOVERY

MaxSpace® allows you to recover up
to 90% of conduit space.

90% RECOVERY

MaxSpace® allows you to recover up
to 90% of conduit space.

MaxCellEdge logo. Link to MaxCell Edge solution page.

Remove. Recover. Renew With MaxSpace®

Since the first fiber optic cables were installed in the 1980s, the only way operators could add capacity to their networks was by installing new conduit and innerduct infrastructure. This was a time consuming and expensive process, with additional engineering and permitting costs, EPA reviews and approval, and a major disruption to traffic, homeowners, and merchants.

Why choose it?

MaxSpace is a patented, no-dig, conduit space recovery service allowing you to safely remove existing rigid innerduct from around the active fiber cables with virtually no load on the cables and recover up to 90% of conduit space.

Features and Benefits

  • There is no service interruption, no trenching, no permits, and no restoration
  • The safer choice for existing infrastructure
  • Overall more sustainable solution – extracted innerduct will be chipped for easy recycling and disposal
  • Tension exerted on cables does not exceed 50 lbs.

How it works:

  • The MaxSpace conduit space recovery solution utilizes a compact machine engineered for tight vault spaces
  • A split metal sleeve is used to protect active cable during innerduct extraction
  • Draws rigid innerduct into the machine using opposing drive wheels
  • Slices innerduct into quarters with four cutting blades
  • Feeds sliced innerduct into a chipping machine
  • Compresses chipped material into disposal bags for easy recycling
  • Cut and abrasion resistant

Use your new, recovered space to load your pathways with MaxCell innerduct for cables you
need now and in the future, and save a significant amount of money on installation and
infrastructure costs. MaxSpace is the smarter, safer, simpler, and more sustainable way to add
capacity to your network.

Download our MaxSpace Brochure

MaxSpace Brochure

Ready to remove existing innerduct with the
no-dig conduit space recovery service?